Happy Drive
The railways go under the road through tunnels and over it on bridges. You never stop for a boom gate. Tap to keep your car in the gaps.
Tap, click, or press space or the up arrow to rise. P pauses.
The real thing
Victoria's Level Crossing Removal Project began in 2015. By September 2026, 96 crossings were gone, with the railway sent into a trench or tunnel or lifted onto a bridge, or the road taken over or under the line. The government's target is 110, so 14 are still to go, now due by 2033. (source) (deferrals)
What it fixed
- Ferris Road, Cobblebank: drivers no longer wait 28 minutes at the boom gates in the morning peak. (source)
- Mordialloc, Aspendale and Truganina: up to 40 minutes of boom-gate time in the morning peak, gone. (source)
- Ferguson Street, North Williamstown: two deaths and at least five near misses before it was removed in 2021. (source)
- The government says removals prevent an average of 121 crashes and near misses a year (government figures). (source)
What it cost
- The Auditor-General found the first 50 rose from an estimated $5 to 6 billion to $8.3 billion, while delivery ran ahead of schedule. (source)
- The 2026-27 budget papers list $8.59 billion for the "85 by 2025" package and $6.41 billion for the 25 more promised in 2018. They don't say whether the first figure includes the original 50, so we haven't added them up. (source)
- Projects like this are part of why Victoria borrows: you pay over time for something that saves time every day. Driving 10 km in central Melbourne takes about 23 minutes on average; in London it takes over 36 (TomTom Traffic Index 2025). (source)
Where the Liberals stand
- The Napthine Coalition government planned to remove four crossings in 2014: Main Road, Blackburn Road, Burke Road and North Road. All four were removed by the current program. (source)
- In 2016 Matthew Guy said "sky rail" would be "devastating for the Frankston line" and backed rail under road instead. He opposed the design, not the removals. (source)
- In 2018 the Coalition promised to finish removals already under way but not to add more, and called Labor's $6.6 billion pledge for 25 more unfunded. (source) (2018 policy)
- In 2023 Liberal David Southwick told Parliament "the opposition support the removal of level crossings", while attacking cost overruns. (source)
- In October 2026 a Labor government release claimed Jess Wilson's Liberals "will stop" work on the Anderson Street and Hudsons Road crossings as part of their cuts. That's Labor's claim; we couldn't find a Liberal statement on it. (source)
Street names are in removal order, from the government's releases and Wikipedia's list of removals, which cites the project's own pages (the project site blocked our tools). The game is a game: real removals don't make your car fly.